Menu

Gas Station Underground Storage Tank Upgrade Activities

Cleanup, Remediation, and Closure | Underground Storage Tank Assessment | Forensic Environmental Engineering

Fuller c store photo

Remediation and Closure

BLDI was retained as the Qualified Consultant (QC) to assist with underground storage tank (UST) upgrade and closure activities. During UST removal activities a soil investigation was conducted around the USTs. This soil investigation resulted in the discovery of the confirmed release at the Site. Due to the nature of the release, the investigation and remediation were funded by the UST insurance policy. Per state regulations, BLDI conducted all the required investigations and report submittals. Since UST upgrade activities were taking place, the chosen remedial action was soil excavation and off-site disposal at a licensed Type II landfill. Approximately 3,200 cubic yards of soil were removed from the Site. BLDI was able to obtain Part 213 closure for the Site in 2015.

New UST being installed